Jump to content

From childhood stargazing to building a lunar space station  


Recommended Posts

  • Publishers
Posted

Even growing up in the heart of Washington, D.C., stargazer Oliver Ortiz felt a connection to space from a young age and always wondered what was beyond the city lights. Now a seasoned engineer with Northrop Grumman, he is contributing to a new era of space exploration with Gateway, humanity’s first space station in lunar orbit, and a critical part of NASA’s Artemis missions that will establish a long-term presence at the Moon.

A portrait of Northrop Grumman engineer Oliver Ortiz, who has shoulder-length brown hair, is wearing a blue shirt with the Northrop Grumman logo on the left breast, as he flashes a smile and stands in front of some green and magenta-speckled foliage.
Oliver Ortiz poses for a portrait, Wednesday, Aug. 23, 2023, at the NASA Headquarters Mary W. Jackson Building in Washington. Photo Credit: (NASA/Bill Ingalls)

Ortiz leads Northrop Grumman’s systems engineering team focused on the integration of Gateway’s foundational elements, HALO (Habitation and Logistics Outpost) and the Power and Propulsion Element. HALO is set to launch with the Power and Propulsion Element on a SpaceX Falcon Heavy rocket ahead of the Artemis IV mission, providing living quarters and the space station’s power and orbital control.

He embarked on his engineering journey at the University of Maryland College Park, obtaining both his undergraduate and master’s degrees in aerospace engineering. He joined Northrop Grumman as an intern in 2014 and quickly rose through the ranks, shaping his career in systems engineering while making significant contributions to various space programs, including commercial resupply missions to the International Space Station.

Ortiz’s path to the world of space engineering was not clear. He first set out to be an astronomer, but changed course toward a career in engineering that now has him leading a team of engineers responsible for ensuring the systems of Gateway’s first two elements are well-integrated and ready to be the building blocks of the lunar outpost.

“I’ve loved space since I was in elementary school and initially wanted to be an astronomer,” said Ortiz. “My undergrad English professor was married to an astronomer and offered to introduce me to her husband. It was in that coffee shop meet and greet that I realized I did not want to be an astronomer. I wanted to be an aerospace engineer and I’m forever grateful that he and fate pointed me in the direction of my true passion.”

It was Ortiz’s involvement in designing Next Step-1, a precursor to HALO, that defined his current trajectory when Northrop Grumman was chosen as Gateway’s prime contractor responsible for designing and fabricating HALO. Since 2016, Ortiz has dedicated his career to the creation of the world’s first habitat designed to support sustainable life outside Earth orbit.

“Sustainability for me means we can learn enough from living on and around the Moon that we can ultimately go to Mars,” Ortiz said. “The Moon is the steppingstone to what’s next and we have to learn how to build a safe environment in an economically efficient way.”

Built with commercial and international partnerships, Gateway is a vital component of the Artemis missions, helping NASA and its partners test the technologies and capabilities for a sustained human presence in deep space.

Primary article author: Tiffany Travis

P

View the full article

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Similar Topics

    • By Space Force
      U.S. Space Force Chief of Space Operations Gen. Chance Saltzman and Italian Air Force Chief of Staff Lt. Gen. Luca Goretti signed a statement of understanding.

      View the full article
    • By European Space Agency
      Image: Part of the Italian island of Sardinia is featured in this image captured by the Copernicus Sentinel-2 mission. View the full article
    • By NASA
      NASA astronaut and Expedition 72 flight engineer Anne McClain is pictured near one of the International Space Station’s main solar arrays during a spacewalk.NASA/Nichole Ayers In this May 1, 2025, photo taken by fellow NASA astronaut Nichole Ayers, Anne McClain works near one of the International Space Station’s main solar arrays during a spacewalk. During the May 1 spacewalk – McClain’s third and Ayers’ first – the astronaut pair relocated a space station communications antenna and completed the initial mounting bracket installation steps for an International Space Station Rollout Solar Array, or IROSA, that will arrive on a future SpaceX commercial resupply services mission, in addition to some get ahead tasks.
      Learn more about station activities by following the space station blog.
      Image credit: NASA/Nichole Ayers
      View the full article
    • By NASA
      One half of NASA’s nearly complete Nancy Grace Roman Space Telescope just passed a lengthy test to ensure it will function properly in the space environment. This milestone keeps Roman well on track for its target launch by May 2027, with the team aiming for as early as fall 2026.
      This photo shows half of the NASA’s Nancy Grace Roman observatory — the outer barrel assembly, deployable aperture cover, and test solar arrays — fully deployed in a thermal chamber at NASA’s Goddard Space Flight Center in Greenbelt, Md., for environmental testing. Credit: NASA/Sydney Rohde “This milestone tees us up to attach the flight solar array sun shield to the outer barrel assembly, and deployable aperture cover, which we’ll begin this month,” said Jack Marshall, who leads integration and testing for these elements at NASA’s Goddard Space Flight Center in Greenbelt, Maryland. “Then we’ll complete remaining environmental tests for the flight assembly before moving on to connect Roman’s two major assemblies and run the full observatory through testing, and then we’ll be ready to launch!”
      Prior to this thermal testing, technicians integrated Roman’s deployable aperture cover, a visor-like sunshade, to the outer barrel assembly, which will house the telescope and instruments, in January, then added test solar panels in March. They moved this whole structure into the Space Environment Simulator test chamber at NASA Goddard in April.
      There, it was subjected to the hot and cold temperatures it will experience in space. Next, technicians will join Roman’s flight solar panels to the outer barrel assembly and sunshade. Then the structure will undergo a suite of assessments, including a shake test to ensure it can withstand the vibrations experienced during launch.
      This photo captures the installation of the test solar panels for NASA’s Nancy Grace Roman Space Telescope, which took place in March. One panel is lifted in the center of the frame on its way to being attached to the outer barrel assembly at right. The deployable aperture cover is stowed on the front of the outer barrel assembly, and the other half of the observatory — the spacecraft and integrated payload assembly, which consists of the telescope, instrument carrier, and two instruments — appears at the left of the photo.Credit: NASA/Jolearra Tshiteya Meanwhile, Roman’s other major portion — the spacecraft and integrated payload assembly, which consists of the telescope, instrument carrier, and two instruments — will undergo its own shake test, along with additional assessments. Technicians will install the lower instrument sun shade and put this half of the observatory through a thermal vacuum test in the Space Environment Simulator.
      “The test verifies the instruments will remain at stable operating temperatures even while the Sun bakes one side of the observatory and the other is exposed to freezing conditions — all in a vacuum, where heat doesn’t flow as readily as it does through air,” said Jeremy Perkins, an astrophysicist serving as Roman’s observatory integration and test scientist at NASA Goddard. Keeping the instrument temperatures stable ensures their readings will be precise and reliable.
      Technicians are on track to connect Roman’s two major parts in November, resulting in a complete observatory by the end of the year. Following final tests, Roman is expected to ship to the launch site at NASA’s Kennedy Space Center in Florida for launch preparations in summer 2026. Roman remains on schedule for launch by May 2027, with the team aiming for launch as early as fall 2026.
      This infographic shows the two major subsystems that make up NASA’s Nancy Grace Roman Space Telescope. The subsystems are each undergoing testing prior to being joined together this fall.Credit: NASA’s Goddard Space Flight Center To virtually tour an interactive version of the telescope, visit:
      https://roman.gsfc.nasa.gov/interactive
      The Nancy Grace Roman Space Telescope is managed at NASA’s Goddard Space Flight Center in Greenbelt, Maryland, with participation by NASA’s Jet Propulsion Laboratory in Southern California; Caltech/IPAC in Pasadena, California; the Space Telescope Science Institute in Baltimore; and a science team comprising scientists from various research institutions. The primary industrial partners are BAE Systems Inc. in Boulder, Colorado; L3Harris Technologies in Rochester, New York; and Teledyne Scientific & Imaging in Thousand Oaks, California.
      By Ashley Balzer
      NASA’s Goddard Space Flight Center, Greenbelt, Md.
      ​​Media Contact:
      Claire Andreoli
      NASA’s Goddard Space Flight Center
      301-286-1940
      Share
      Details
      Last Updated May 07, 2025 EditorAshley BalzerContactAshley Balzerashley.m.balzer@nasa.govLocationNASA Goddard Space Flight Center Related Terms
      Nancy Grace Roman Space Telescope Goddard Space Flight Center Technology Explore More
      6 min read NASA’s Roman Mission Shares Detailed Plans to Scour Skies
      Article 2 weeks ago 6 min read Team Preps to Study Dark Energy via Exploding Stars With NASA’s Roman
      Article 2 months ago 6 min read How NASA’s Roman Space Telescope Will Illuminate Cosmic Dawn
      Article 10 months ago View the full article
    • By European Space Agency
      Fresh from the cleanroom in Bremen, Germany, the second of the Meteosat Third Generation satellites and the first instrument for the Copernicus Sentinel-4 mission have arrived at Cape Canaveral harbour, in the US.
      View the full article
  • Check out these Videos

×
×
  • Create New...